SS 220 kV "Taganrog-10" (T-10)

SS 220 kV SS 220 kV SS 220 kV SS 220 kV SS 220 kV SS 220 kV
Hide pictures
Show all pictures

Reconstruction and technical re-equipment of substation

Substation 220 kV Taganrog-10 was commissioned in 1961. Security of supply of industrial centre of Rostov region, large consumers of the region in particular metallurgical plant of Taganrog depend on its stable work.

Specialists of Energostroy-M.N., JSC prepared working documentation, perform installation and construction works on reconstruction and technical re-equipment of substation, so the quantity of cells of Outdoor Switchgear 220 kV will increase from two to eight. Substation will be equipped with modern systems of RPA, ECA, automatic control system of technological process, automated measuring and information system for electric power fiscal accounting.

Maximum load, MVA 250
Quantity and autotransformer power 220 kV, pcs.xMVA           2x125
Overhead line 220 kV 2
Cable line 220 kV 1
Auxiliary normal transformer 10/0,4 kV, pcs.x630 kV 1
Substation control building 2